About the Course : The Indian power Sector is presently passing through a phase of transition of technology up-gradation in the area of Generation and Transmission. Several new Ultra Mega Thermal power Projects are in the process of installation both in Public and private sectors where advanced technology with super critical parameters supported by the state of the art Control & Instrumentation system are being adopted. Simultaneously to evacuate the power, several EHVsubstations and long Transmission lines would be erected with associated distribution system. Presently India has the largest Electricity Grid in the World and world’s third largest Transmission and Distribution network. The ambitious plan of Govt. of India for adding additional 151069 MW of Generation Capacity during 11th and 12th plan period will be supplemented by corresponding strengthening of infrastructure addition in the T&D sector. To achieve this objective, additional 163000 CtKms and 30 Crores consumers would be added to the present T&D network. Various new technologies like Ultra High Voltage (AC/DC) transmission system, Facts, SCADA application, remote operation of Substation etc. The management of this huge network shall be a challenging task. To man this huge transmission System and Distribution network, a huge manpower adequately trained shall be required which will be of the order of 10.00 Lacs. Keeping all these aspects in view, CBIP has taken this initiative to launch the 26 weeks Post Graduate Diploma Course in Transmission & Distribution System following the syllabus as per the requirement of Indian Electricity Regulations for the fresh graduate engineers who would be groomed as per the requirement of Indian Power Industry. The duration of the course would be 26 weeks which will include the class room sessions as well as on-the-job training. The students have to attend the on-job practice
sessions in various Substations. Visit to some reputed manufacturing plants shall also be arranged. To enhance the personal skills, some inputs of Management are also to be given to the students. The 2nd batch is
completing their course on 9th November, 2012 and course in question is 3rd in series.
Course Objectives : After completion of the course the students will acquire extensive basic and advanced knowledge of Operation & Maintenance of Transmission and Distribution accessories Necessary safety aspects required in T&D Details of associated equipments T&D project management Process flow, Electrical and IT application in T&D
Methodology for the Course : Classroom Lecture Sessions, Sub-station Visits Scheme Tracing in Switch yard of Substation, On-Job Operation & Maintenance Training at different Substations, Group Discussion session Projects, Seminars Submissions
Eligibility : For Non-sponsored candidates, Bachelor of Engineering or equivalent in Electrical Engineering with minimum 60% all through (10th , 12th & Graduation) marks. For Sponsored candidates, they should have 60% in the Engineering Graduation.
Total Seats : 60 (Sixty Seats - Provisional), 10% seats reserved for candidates sponsored from Power Utilities and reputed companies of Indian Power 7 Sector having more than one year experience. In case of non-availability of sponsored candidates, the balance seats under this category shall be available for non-sponsored candidates. The total seats may decrease or increase purely at the discretion of CBIP.
Selection Criteria for Admission :
Based on the merit of CET 2012 or Gate 2012 or qualifying degree as applicable.
Age Limit :
Maximum 27 years for non-sponsored candidates as on 24/12/2012.
Security Deposit : An amount of Rs. 5000/- as security deposit which is refundable has to be deposited by the student at the time of admission.
Placement : CBIP maintains close linkages with various power utilities and reputed companies of Indian Power Sector. Most of the Govt. utilities, IPPS, T&D utilities etc and other reputed manufacturing organizations of the above said field are associated with CBIP as member organizations and prefer to depute their Engineers to attend the training programmes/Workshops/ Seminars at CBIP. Though there is no commitment for placement of the candidates, CBIP would try its best and exploit all the opportunities for arranging campus interviews through its good networking with all of the power sector utilities/companies including reputed manufacturers. While almost all the candidates of 1st Batch of PGDC in Transmission & Distribution System have been placed, about 40% students of 2nd batch (which is currently in progress) have been placed and the placement activities are still going on and it is hoped that very good placement shall be achieved in near future.
Last Date : 24 December 12
Click Here For More Details: